Big day in Manchester today. One of our Schwing 31Telescopic’s pouring the Crane base for Renaker on this huge 52 floor tower block. The pour was completed by 15.00pm, with 380 cube in and done.
Big day in Manchester today. One of our Schwing 31Telescopic’s pouring the Crane base for Renaker on this huge 52 floor tower block. The pour was completed by 15.00pm, with 380 cube in and done.