Where a project is subject to strict time constraints, liquid screed is the preferred solution, since it can be forced-dried after only seven days, whereas traditional screeds need many times that figure.
A liquid screed can also be walked on within 24 hours, meaning that disruption to other trades working on-site can be kept to a minimum, speeding up their work too.
Liquid screeds have an advantage over traditional screeds in that they can cover underfloor pipework completely, leaving no air gaps that can slow down, or even prevent heat transference. Compared to standard screed, liquid screed is 100% more efficient in terms of heat transference.