The incredibly versatile Schwing S20 working perfectly within these tight parameters. Really impressive unit.
Our new Schwing S20 proving very useful for these tight, low height buildings where space is a premium.
With the continued growth of our company, I am pleased to announce the arrival of the latest unit, The Schwing S20 (mini mac), stickers on and ready to go. 👍
Really proud to announce the arrival of our latest concrete pump. The new Schwing 24/4 all ready to go. 👍
Big day in Manchester today. One of our Schwing 31Telescopic’s pouring the Crane base for Renaker on this huge 52 floor tower block. The pour was completed by 15.00pm, with 380 cube in and done.
2 Schwing 31M Telescopic’s working on this reservoir project. Inside or out the 31T is a master in its own right. Powerful, robust and versatile.
Riser pipeline installed and the pour completed for Cara Flooring in Manchester. Cemex provided the steel fibre mix, which pumped brilliantly.
Our Schwing S38SX working within tight parameters on this reservoir project. With it’s compact setup range, optimising the easy option, short – rig system, offers the larger boom size when the setup site is minimal.
Early Saturday morning pour in Manchester for Cara Flooring with our Schwing S43SX (brilliant pump). 8th Floor today 9th on Monday.
Our 43m working in between 2 trees with preservation orders assigned to them. Quirky set-up for our Schwing 43SX, the boom landed perfectly.
We managed to safely operate our 38m truck mounted concrete pump indoors within a large industrial unit.
We get working on some random projects! Our Schwing 38m at West Midlands Safari Park casting a slab for a new building.
Macfarlane has been busy pumping liquid screed in Manchester City Centre for a large construction project on St Peters Square.
Our Schwing S43SX concrete pump visited Glan Clwyd Hospital in Bodelwyddan on Saturday, to pour a concrete base within a courtyard.
The team were in Didsbury just outside Manchester this weekend pouring the foundations for a new property.
We were asked to pour the concrete slab for a Scouts Group in Knutsford who are constructing a new modern community building.
We brought in our 36Z fold truck mounted concrete pump to pour the outside bays for a development in Liverpool.
The team have been in Liverpool to help out with the construction of a new £30m car park, covering approximately 500,000 sq over nine levels.
A recent project required two pumps (43 & 36) pouring 350 cube in Manchester City Centre for OBR.
A recent project on the Wirral had our team negotiate a tight road in Heswall for a construction project.
We headed over to the Island of Anglesey to pour the foundations for new silos to be constructed at a Cheese Plant.