We were recently involved in the construction of a commercial building in the centre of Manchester.
After the removal of the tower crane, we were instructed to install a vertical riser through the centre of the building to the top floor.
Once constructed, we pumped a steel fibre concrete mix to the top floor, breaking down the pipeline and removing it as we came down the building.
All 14 floors were completed in one day.